Skip to content

Kovilic Construction Co Inc government contracts

$62.1M obligated across 13 federal awards. 7 are still running.

UEI EVBUYJTMKL45Latest award Sep 8, 2026

Who buys from Kovilic Construction Co Inc

What Kovilic Construction Co Inc sells

Its awards by NAICS code. Codes with live notices link to them.

IndustryAwardsObligated
Highway, Street, and Bridge Construction

NAICS 237310

12$51M
Other Heavy and Civil Engineering Construction

NAICS 237990

1$11.1M

Contracts ending soon

Awards that end in the next 18 months, soonest first. Expiring work is often recompeted.

AwardObligatedStartEnd
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RA

Federal Highway Administration · 693C7325F00122N

$3.9MSep 22, 2025Feb 3, 2027
COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT

Forest Service · 12445226C0013

$1.2MSep 8, 2026May 31, 2027
WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EX

Federal Highway Administration · 693C7324C000017

$10.2MAug 28, 2024Oct 31, 2027
HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT

Forest Service · 12445526C0010

$2.8MApr 1, 2026Nov 19, 2027
PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MI

Federal Highway Administration · 693C7326F00002N

$1.6MOct 24, 2025Dec 1, 2027
PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND S

Federal Highway Administration · 693C7323C000016

$13.6MAug 31, 2023Dec 31, 2027
PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WOR

Federal Highway Administration · 693C7324F00015N

$1.3MDec 8, 2023Dec 31, 2027

Largest awards

By total obligated value. Each links to its record on USAspending.gov.

AwardObligatedStartEnd
PROJECT NC NP BLRI 2A16 THE PROJECT CONSISTS OF THE REHABILITATION OF BIG PINE CREEK BRIDGE #6, BIG PINE CREEK BRIDGE #3, AND BRUSH CREEK BRIDGE #1 BETWEEN MM 223.00 AND MM 228.00. THE WORK INCLUDES REHABILITATION OF THE SUBSTRUCTURE AND S

Federal Highway Administration · 693C7323C000016

$13.6MAug 31, 2023Dec 31, 2027
GAOA CHOH 241449 RESTORE CANAL PRISM AND STABILIZE HISTORIC DRY LAID STONE WALL

National Park Service · 140P2023C0015

$11.1MNov 15, 2022Oct 31, 2024
WV NP NERI 107(2) THE PROJECT CONSISTS OF GRANULAR BACKFILL, MSE WALL CONSTRUCTION, DEEP GEOTECHNICAL PATCHES, PIPE CULVERTS, INLETS, MANHOLES, CURB AND GUTTER, ASPHALT PAVED WATERWAY, AND GUARDRAIL REPLACEMENT. THE WORK INCLUDES ROADWAY EX

Federal Highway Administration · 693C7324C000017

$10.2MAug 28, 2024Oct 31, 2027
PROJECT NP-GUIS 15(3) THE PROJECT CONSISTS OF THE RECONSTRUCTION OF PARK ROAD AND THE CONSTRUCTION OF PAVED SHOULDERS. THE WORK INCLUDES RECONSTRUCTION OF THE ONE LANE ENTRANCE PORTION OF PARK ROAD, CONSTRUCTION OF PAVED SHOULDERS, GUARDRAI

Federal Highway Administration · 693C7321C000022

$4.7MAug 9, 2021Jun 18, 2024
ND FLAP 704(1) AND 795(1) MAGPIE &WHITETAIL CROSSINGS

Federal Highway Administration · 6982AF24C000006

$4.6MDec 26, 2023Oct 11, 2025
PROJECT MD NP BAWA 1(12), 2(12) THE PROJECT CONSISTS OF THE REPAIR AND REHABILITATION OF STRUCTURES NO. 3530-003P, 3530-004P, AND 3530-021P WITHIN THE BALTIMORE-WASHINGTON PARKWAY. THE WORK INCLUDES DECK REPAIR, CAPSTONE, JOINTS REPAIRS, RA

Federal Highway Administration · 693C7325F00122N

$3.9MSep 22, 2025Feb 3, 2027
SD FTBL BCB(1) HORSE SOLDIER ROAD TO FORT MEADE

Federal Highway Administration · 6982AF22C000016

$3.5MMar 2, 2022Jul 12, 2022
HUNTINGTON RAVINE WAT BRIDGES REPLACEMENT

Forest Service · 12445526C0010

$2.8MApr 1, 2026Nov 19, 2027
MAMMOTH CAVE NATIONAL PARK - NP-MACA 13(1), 14(2) - THE PROJECT CONSISTS OF THE RECONSTRUCTION OF THE GREEN RIVER FERRY ROAD RAMPS NEAR MP 1.31 AND SHOULDER HARDENING ON MAMMOTH CAVE PARKWAY. THE WORK INCLUDES THE REMOVAL AND RECONSTRUCTIO

Federal Highway Administration · 693C7319C000015

$2.3MMay 3, 2019Jun 18, 2024
PROJECT VA ERFO FS GWJEF808 2020-2(2) THE PROJECT CONSISTS OF FINALIZING THE DESIGN FOR REPLACING LICK CREEK TRAIL BRIDGE AND CONSTRUCTION OF A TEMPORARY ACCESS TRAIL, TEMPORARY HELICOPTER LANDING PAD, TRAIL BRIDGE REPLACEMENT, AND OTHER MI

Federal Highway Administration · 693C7326F00002N

$1.6MOct 24, 2025Dec 1, 2027
PROJECT MD ERFO NPS CHOH 2019-1(1): THE PROJECT CONSISTS OF EMBANKMENT SLOPE REPAIR WITH RIPRAP SLOPE AND ROCKERY WALL CONSTRUCTION, PAVEMENT PATCHING, GUARDRAIL, SHOULDER REPAIRS, DRAINAGE REPLACEMENT, AND OTHER MISCELLANEOUS WORK. THE WOR

Federal Highway Administration · 693C7324F00015N

$1.3MDec 8, 2023Dec 31, 2027
COOTER CREEK ROAD BRIDGE (FSR 202, MP 3.1) REPLACEMENT

Forest Service · 12445226C0013

$1.2MSep 8, 2026May 31, 2027

Similar contractors

Companies winning under the same main NAICS code.

ContractorAwardsObligated
Southwest Valley Constructors Co

UEI W31DQKBPJCD3

5$2.3B
BFBC LLC

UEI PTZXAS7WKA23

5$1.8B
Fisher Sand & Gravel Co

UEI DGT8NKKG9NR3

3$1.6B
Slsco, LTD.

UEI F1PMZXNJ7NM5

7$1.1B
Granite Construction Company

UEI VAYJNMM2KBE5

8$282M
Estes Bros. Const. Inc.

UEI YKVNGM329N76

20$263M

Stop checking this page by hand

Matched, not listed

Describe your company once. Captivaq scores every new notice against your capabilities, locations, and set-asides.

Earlier than the RFP

Forecasts and sources sought notices surface months before the solicitation, while you can still shape the win.

A draft, not a link

For the bids worth pursuing, it reads the solicitation and drafts the response with citations back to the source.

Build a matching profile

Questions people ask

What is Kovilic Construction Co Inc's UEI?

EVBUYJTMKL45. The Unique Entity ID is the 12-character number SAM.gov assigns to every company that registers to do business with the federal government. It replaced the DUNS number in 2022.

How much has Kovilic Construction Co Inc won in federal contracts?

$62.1M obligated across 13 awards in Captivaq's records, most of it from Federal Highway Administration. That covers contracts of $1M or more active since October 2023, so the full history is larger.

Which Kovilic Construction Co Inc contracts end soon?

7 awards end in the next 18 months, listed on this page. Expiring contracts are often recompeted, which is the opening for a competitor or a teaming partner.

Figures come from federal award records published on USAspending.gov: contracts of $1M or more active since October 2023, plus smaller awards tied to open opportunities. They are not a complete contract history; each award above links to its official record.

Captivaq is an independent service from Logesta Labs LLC and is not affiliated with or endorsed by the U.S. government or SAM.gov. The notice on the official source portal is the record that governs; confirm deadlines and amendments there.