Skip to content

Redstone Surveying goes from notice to bid in a day

A land surveying company in upstate New York took a week to turn a notice into a bid. Captivaq pulls the requirements, drafts the package, and the owner now finishes the bid the day after the notice posts.

Hannah KowalskiOwner, Redstone Surveying

Key results

  • Notice to submitted bid in one day, down from a week

  • Requirements pulled and cited to the section

  • Drafts exported to Word for the licensed stamp

“A bid used to take me a week of evenings. Now the draft is waiting when I open the match, and I finish it in a day.”
Hannah KowalskiOwner, Redstone Surveying

Meet Redstone Surveying

Redstone Surveying does boundary, topographic and construction surveys for state agencies and federal land offices across upstate New York. Hannah Kowalski is the licensed surveyor and the owner.

Survey contracts are small and frequent. The bidding is the bottleneck, because every bid needs the same forms, the same qualifications and a fresh reading of the scope.

“The surveying takes a day. The bid took a week. Something was backwards.”

A week of evenings

Hannah read the package, copied the requirements into a checklist by hand, and rebuilt the qualifications section from the last bid. Then she wrote the technical approach from a blank page.

By the fourth evening the deadline was close and the bid was rushed. Some notices went unbid because the week was not there.

“I turned down work because I did not have a week of evenings to bid on it.”

The profile holds the qualifications

Captivaq drafted the profile from the website, and Hannah added the licences, the equipment and the past surveys with their agencies. That is the material every bid used to rebuild by hand.

“Everything I retyped for every bid now lives in one place, and the draft pulls it in.”

Every notice on SAM.gov and the New York State Contract Reporter is scored against that profile, and a strong match arrives with the requirements already pulled and cited.

Notice to bid in a day

Hannah opens the match, reads the requirement list, and the draft is waiting. She edits the technical approach, checks the compliance matrix, and exports the package to Word for her stamp.

“Now the draft is waiting when I open the match, and I finish it in a day.”

Redstone bid on every matching notice last quarter for the first time. The week of evenings is gone, and the surveying is once again the longest part of the job.

Keep reading

More customers

View all

Set up your company once. It keeps looking after that.

Tell us what you do, where you work, and what you have won. We match every new US and Canadian notice against that, score the fit, and draft the bids you decide to go after.

  • US and Canada in one search
  • You review and submit every bid
  • Two months free on annual billing
  • Cancel anytime